Turn a pipe’s horizontal run and gradient into its fall, or its fall into a gradient.
Measure the horizontal distance from the downpipe to the soakwell, 0.1 to 200 m.
1 in 100 drops 1 mm for every 100 mm of horizontal run.
How much lower the pipe's far end sits.
120 mm
Meets the 1 in 100 minimum for 90 to 150 mm pipes
Checked against 1 in 100 (1%), the minimum grade AS/NZS 3500.3 sets for stormwater pipes from 90 to 150 mm. Minimum fall is the fall this run needs at that grade.
A pipe’s fall is how far it drops from one end to the other. Its gradient is that fall divided by the horizontal distance the pipe covers, its run, written as 1 in X: a pipe at 1 in 100 drops 1 mm for every 100 mm of horizontal run, or 10 mm per metre. Three formulas convert between them, with the run in metres and the fall in millimetres:
The calculator opens on a 12 m run at 1 in 100: 12 × 1,000 ÷ 100 = 120 mm of fall. If the same pipe drops 150 mm instead, its gradient is 12,000 ÷ 150, or 1 in 80 (1.25%).
Measure the run level, as on a site plan, not along the sloping pipe. Measure the fall between the bottom of the pipe at each end. The ground above often slopes differently from the pipe beneath it.
AS/NZS 3500.3, the Australian Standard for stormwater drainage, sets the flattest grade a stormwater pipe can be laid at. AEC Assistant’s summary of AS/NZS 3500.3:2025, Table 6.3.4, gives one minimum for the pipe sizes used around a house: 1 in 100 (1%) from DN 90 to DN 150. Other drains have their own grades:
| Drain | Flattest grade | Set by |
|---|---|---|
| Stormwater pipe, DN 90 to DN 150 | 1 in 100 (1%) | AS/NZS 3500.3:2025, Table 6.3.4 |
| Box gutter | 1 in 40 to 1 in 200 | AS/NZS 3500.3:2025, Clause 3.7 |
| Subsoil drain | 1 in 300 (0.33%) | NCC 2022 Housing Provisions, 3.3.4 |
At 1 in 100, a 6 m run needs 60 mm of fall and a 20 m run needs 200 mm. The subsoil grade is for slotted pipe that drains the ground, not for roof water.
The pipe also needs cover. The 2022 Housing Provisions ask for at least 100 mm over a 90 mm Class 6 UPVC stormwater pipe under soil, 50 mm under paving or concrete, and 75 mm under reinforced concrete or 100 mm under paving where cars drive. Cover and fall together set how deep the pipe reaches the soakwell, which decides how deep the soakwell sits.
Around a house, pipe size doesn’t change the minimum grade: the standard’s 1 in 100 applies to DN 90, DN 100 and DN 150 alike. What size changes is how much water a pipe carries. At the same grade, a larger pipe carries more, so when a long run can’t get more fall, a larger pipe is how it carries more water.
The standard sets the smallest size too. In AEC’s summary, the minimum is DN 90 for a single dwelling in a rural area or a residential building on an urban lot under 1,000 m². On other properties, the pipe downstream of a stormwater or inlet pit must be at least DN 150 and at least as large as the largest pipe entering the pit.
Steeper isn’t always better. The standard caps the speed of water in a full pipe at 2 m/s and advises 1.5 m/s for a pipe leaving a pit, so water in a very steep run can move too fast. When we connect downpipes to soakwells, we set each pipe’s size and fall to suit the roof it drains.