For a home in the City of Wanneroo, size the soakwell for the roof and paved area that drains to it. The City’s residential guide pairs common concrete soakwell sizes with the area they can drain in normal rainfall. On a new estate, check the approved drainage plan for your lot before you choose a size.
Published Updated
WA Soakwells
Sized to your council’s rule
We work out the soakwell volume your roof, paving and council need before we price, so the system copes with a storm.
No call-out fee
City of Wanneroo Soakwell Sizing Rule
The City’s soakwells and stormwater runoff guide gives the “approximate roof or paved surface area they can drain under normal rainfall conditions” for six concrete soakwell sizes. Count the roof and sealed paving that drain to each soakwell.
Take a house with 140 m² of roof and 40 m² of sealed paving. If the pipework splits that 180 m² evenly, each soakwell receives runoff from 90 m². The City’s table pairs a 1,300-litre soakwell with about 111 m². Two of that size cover the example in normal rainfall where the soil and layout suit soakwells.
The guide also pairs a 580-litre soakwell with about 47 m² of roof or paved area. Use the sizing basis that applies to your lot when you calculate the soakwell size.
Placement and Distances
The City’s residential stormwater guide recommends at least one soakwell width of clearance from buildings and boundaries when the soakwell is at least as wide as it is deep. For a round soakwell that is 900 mm wide and 900 mm deep, allow at least 900 mm from the building and 900 mm from the boundary.
Allow for the footings when you set out the excavation. Digging too close can undermine footings, retaining walls or boundary fences. The City advises against squeezing a soakwell into a narrow strip between the house and boundary because there may be too little ground for the water to drain into. Plan where overflow will go so it stays clear of buildings and neighbouring properties.
Approvals and Inspections
When a residential addition needs planning approval, include a drainage plan showing the size, location and capacity of each soakwell. Mark any grated, trafficable lids where soakwells sit under a driveway or vehicle accessway. The City’s residential additions checklist lists the plan details it needs.
Regulation 27 of WA’s Building Regulations 2012 requires tests for specified fire, smoke control and emergency warning systems in Class 2 to Class 9 buildings. Soakwells are outside that list. For a single house, use the conditions of your own permit and planning approval to find out if the City needs to see the drainage work. Read those conditions before backfilling so you can arrange any check while the installation is visible.
Local Soil and Exceptions
Clay or limestone can slow drainage enough for a soakwell to overflow.
On a new estate, ask for the approved drainage details for your lot. The City’s subdivision clearance requirements cover site drainage, approved connections and drainage easements. Mark any easement and the approved way of handling runoff on your site plan before you decide where a soakwell can fit.