Get a free quote

Council Soakwell Requirements in Perth

Compare Perth council soakwell rules for homes before you draw up your drainage plan.

WA Soakwells

Sized to your council’s rule

Get a free quote

No call-out fee

Perth councils commonly size soakwells from the roof and paving that drain into them. Your council also sets the clearance from footings and decides where stormwater can go.

The soakwell requirements for Stirling show how site conditions can change the storage you need. Once you know which rule applies, use the soakwell calculator to estimate how many soakwells your roof and paving need. The WA stormwater rules explain the state requirements that sit alongside the council rules.

What Councils Usually Require

Start with the impervious area your system must drain. That means surfaces such as roofs and sealed paving that shed rainwater. The council’s formula or sizing guide tells you how much storage to allow for that area.

What to check Common approach What can change the design
Storage capacity Use the council’s litres per square metre (L/m²) or its sizing table. The council may count roof and paving separately or require a larger design storm for the site.
Distance from footings Leave enough room to excavate without undermining footings or neighbouring structures. The council may specify a fixed clearance or base it on the soakwell’s dimensions.
Stormwater leaving the lot Plan to contain stormwater on the property. A connection to a street drain needs council approval. For example, Stirling considers one where high groundwater limits infiltration and its drainage system has capacity.

Clay drains slowly, and a shallow water table can leave too little room for water to soak away. The site may need more storage or another approved drainage design.

Council-by-Council Rules

Check how your council counts the area before you compare the figures. Cockburn uses all impervious area in the catchment. Swan’s guide for a single home gives a rate for roof area.

Council Published sizing guidance Council source
City of Stirling 15 L/m² of impervious area under the city’s minimum criteria. Sites that need a drainage management plan are assessed against a larger design storm. On-site drainage criteria
City of Joondalup The sizing table matches soakwell capacity to roof or paved area under normal rainfall conditions. For example, it lists 580 L for about 47 m². Residential soakwells guide
City of Wanneroo If your residential addition needs development approval, show where the soakwells will go and give their size and capacity. If you’ll keep stormwater on site another way, show that on the plan. Residential additions checklist
City of Cockburn 1 m³ per 80 m² of impervious area (12.5 L/m²). The formula assumes the lot sits higher than the road and excess water has a path to flow over the surface. Residential lot drainage requirements
City of Swan The guide gives 12.2 L/m² of roof for a single home. It gives 15.9 L/m² of impervious area for higher-density housing and commercial or industrial development. The figures assume clean sand and a soakwell base at least 2 m above the water table. Soakwell capacity guide

When You Need Approval

When your new home or extension needs a building permit, check the application checklist for stormwater plans. For example, Stirling’s uncertified building permit checklist asks for stormwater disposal details on the site plan. If the project also needs development approval, the council can ask for drainage details at that earlier stage.

A registered building surveyor signs the Certificate of Design Compliance. For a certified application, you lodge the certificate with the plans. For an uncertified application, the council arranges the assessment. The permit authority, usually the council, issues the building permit. WA building approvals process

Read the permit to see whether it lists a drainage inspection or test and when it must happen. If the permit requires one before backfilling, arrange it while the installation is still visible. The builder attaches any required inspection or test certificates to the BA7 notice of completion.

Finding Your Own Council’s Rule

Use the WA council map to find your council. Then look for its residential stormwater guide or contact its building services team with the lot address and a site plan.

Ask which surfaces count towards the storage calculation and whether the council uses a formula or a sizing table for your block. Give the team the proposed soakwell locations so it can confirm the clearance from footings and boundaries. Ask which drawings or certificates the council needs.

If you want to connect to a public drain, ask the council’s drainage team whether it allows a connection for your lot and what written approval you need.

Start here

3 guides

  • Updated

    Soakwell Requirements: City of Stirling

    Building in the City of Stirling? See how to size and place soakwells for roof and paving water, what to put on your plan and when to check for an inspection.

  • Updated

    Soakwell Requirements: City of Joondalup

    Check the City of Joondalup's residential soakwell rules before you build: how much capacity you need, where soakwells can go and what the city inspects.

More guides

2 guides

  • Updated

    Soakwell Requirements: City of Cockburn

    How far from the house can soakwells sit in the City of Cockburn, and how many do you need? See the city's stormwater rules for homes.

  • Updated

    Soakwell Requirements: City of Swan

    Building in the Swan Valley or Ellenbrook? See the City of Swan's soakwell table, clay soil rules and when stormwater can go to the street.

Call today for a free, no-obligation quote