Roof Area Calculator for Gutters and Soakwells
Work out your roof’s plan area and surface from its sections and pitch.
Work out how many soakwells your roof and paving need under your council’s rule.
The roof's footprint, eaves included, that drains to the soakwells.
Driveways, paths and patios. The note under the result lists what your council counts.
Not listed? Use the estimate. Some councils, such as Nedlands, use their own calculator.
Concrete only: this council asks for soakwells of at least 900 x 600 mm.
Inside diameter x depth.
Size: Reln, 150 litres, one unit as sold.
3
1200 x 1200 mm concrete soakwells
An estimate at 0.0125 m³ per m² of roof and paving that drain to the soakwells, the rate Bayswater, Claremont and Cockburn publish. Check your council’s own rule before you build.
The soakwell calculator multiplies the hard surface area your council counts by its storage rate, then divides that volume by what one soakwell holds. The rate is in cubic metres of soakwell for each square metre of hard surface. At 0.0125, the rate Bayswater, Claremont and Cockburn publish, it stores 12.5 mm of rain falling across the whole area.
The number of soakwells rounds up, because part of a soakwell can’t be installed. So the soakwells always hold at least the volume the rule asks for, and usually a little more.
Which surfaces count depends on the council, and the note under the result names them for the rule you choose. The City of Bayswater counts every hard surface that sheds water, such as roofs, paving, driveways and patios. The Town of Victoria Park counts permeable paving too, while the Town of Cambridge leaves it out. If you don’t know your roof’s area yet, measure it first with the roof area calculator.
A concrete soakwell counts at its full internal volume, the figure council tables use too. A polypropylene unit counts at the volume its maker states.
A house with a 200 m² roof and a 40 m² driveway has 240 m² of hard surface. At 0.0125 it needs 240 m² × 0.0125 = 3 m³ of storage, the example the City of Bayswater works on its own sheet. These are the figures the calculator opens on.
One 1200 x 1200 mm concrete soakwell holds 1,357 litres, or 1.357 m³. With 2 of them the block would hold only 2.71 m³, so it needs 3, which hold 4.07 m³ between them.
A council with a higher rate asks for more storage from the same block:
| Council | Storage per m² | Storage needed | 1200 x 1200 mm soakwells |
|---|---|---|---|
| City of Bayswater | 0.0125 m³ | 3 m³ | 3 |
| City of Stirling | 0.015 m³ | 3.6 m³ | 4 |
| Town of Cambridge | 0.02 m³ | 4.8 m³ | 4 |
The City of Stirling stores roof water and paving water in separate soakwells, so it counts them apart: 3 for the roof’s 3 m³ and 1 for the driveway’s 0.6 m³.
Without the driveway, the 200 m² roof alone needs 2.5 m³ at 0.0125. A 556 m² roof needs 6.95 m³, which takes 6 1200 x 1200 mm concrete soakwells. Polypropylene units are smaller: where the council allows them, the example’s 3 m³ takes 20 Reln units of 150 litres each.
The calculator applies the storage rate each council below publishes for houses and small developments. Each council’s name links to the document that sets its rate.
| Council | Storage per m² | Applies to |
|---|---|---|
| City of Bayswater | 0.0125 m³ | Lots in a subdivision clearance |
| Town of Cambridge | 0.02 m³ | Single houses and minor additions |
| City of Canning | 0.0150 m³ | Lots with an overland flow path to the road. Under 300 m², count the whole lot |
| Town of Claremont | 0.0125 m³ | Every development |
| City of Cockburn | 0.0125 m³ | Residential lots higher than the road, with an overland flow path |
| Town of East Fremantle | 0.0125 m³ | Every development |
| City of South Perth | 0.02 m³ | Type 1 houses up to two storeys, and minor additions with no existing private drainage connection, in the Como, Manning and South Perth precincts |
| City of Stirling | 0.015 m³ | Sites that need no drainage management plan |
| City of Swan | 0.0122 m³ | Single houses coded R25 or lower, on sandy soil |
| City of Swan | 0.0159 m³ | R30 or higher, commercial and industrial sites, on sandy soil |
| Town of Victoria Park | 0.0150 m³ | Up to four dwellings |
The rate of 0.0125 m³ per m² is often called the 1 in 20 year rule. Cockburn’s residential guide bases it on a five-minute storm of that frequency. If your council isn’t in the table, the calculator’s estimate uses this rate as a first figure. Ask your council what drainage it requires for your block.
Claremont, East Fremantle, Stirling and Victoria Park set a smallest soakwell of 900 x 600 mm, so for them the calculator offers concrete soakwells only.
Some councils set a storm to hold instead of a rate, so their volume also depends on the soil. The City of Nedlands asks every lot to hold a 1 in 100 year storm and publishes its own soakwell capacity calculator. In Gosnells, the City’s stormwater design calculator covers both 20 and 100 year storms. Melville, Kalamunda and Bassendean ask for a design to a storm of critical duration, usually from an engineer.
The cities of Joondalup and Wanneroo publish a table of soakwell sizes and the roof or paved area each one drains. Their figures work out close to 0.0125.
Your result gives an installer what they need to price the job: how many soakwells, their size and the storage your council’s rule asks for. Use this estimate when asking for a quote. Your installer checks the site and council requirements before the storage and soakwell sizes go on your plans.
The council rates assume clean, free-draining sand with the soakwell base well above the water table. The City of Swan’s soakwell table, for example, assumes the base sits at least 2 m above groundwater in clean sand.
Clay, limestone and a high water table change the answer. Water leaves the soakwell more slowly than the rate expects, so a storm fills it sooner. On clay, the fix is more storage or a different design, and the City of Gosnells asks clayey lots to connect to its drain. In Stirling, groundwater within 1.2 m of the surface means a drainage management plan instead of the 0.015 rate.
When we quote, we check the soil on site and size the soakwells to your council’s rule before we price the job.