Can a Trafficable Soakwell Go Under a Driveway?
Yes, if the trafficable soakwell and its lid are rated for the vehicles that will drive over them. Plan the support under the paving and leave an opening for cleaning before the driveway goes in.
Published Updated
WA Soakwells
Water where it shouldn’t be?
We install channel drains, driveway grates and stormwater pipe, and connect downpipes, so water stops before the house.
No call-out fee
The Short Answer
If the driveway is your only available spot, tell your installer what will actually cross it. A family car pulling into the garage is one case. A loaded delivery truck using the same route during a build is another.
A trafficable lid carries the load at the opening. The soakwell below it also has to carry the loads from the driveway above. Ask for the lid rating and the manufacturer’s installation detail for the soakwell before the paving is laid.
Trafficable Soakwells and Lids
For a driveway used by passenger cars at low speed, Class B is the usual starting point for the lid and its frame. The AS 3996 load classification table puts residential driveways in Class B. Class A is for pedestrian areas.
Gatic’s guide to AS 3996 lists Class C for certain areas with slow-moving commercial vehicles. Class D applies in heavier-duty settings such as loading docks. If a truck will cross the soakwell, tell the designer what it is and where it turns or stops. The right class depends on the wheel loads and how the driveway is used.
AS 3996 covers lids and grates. For the soakwell itself, use the manufacturer’s trafficable detail for the selected concrete or polypropylene system. On a buried modular system, check the required depth of fill above the modules as well as the rating of any surface lid.
Installation Under Paving
The soakwell needs a firm, level bed to sit on. The installation detail specifies the bedding material for that soakwell and how to place and compact the backfill around it. Uneven settlement can leave a dip in the driveway or a lid that rocks.
Where the design calls for a concrete collar, it supports the frame around the opening. Set the top of the lid flush with the finished paving and keep the join around the lid clear so it can still be lifted. Agree on that height with the paver before the frame is set. WA Soakwells can reinstate the paving as part of your soakwell installation.
Getting at It Later
Leave a removable inspection cover at driveway level so a cleaner can reach the soakwell without lifting pavers or cutting concrete. If the chamber is buried deeper, use the system’s access riser, the short shaft that brings the opening up to the surface.
Keep the lifting points exposed and leave room to lift the cover, especially near a wall or fence. Before the paver finishes, have the installer show you which cover gives access for clearing silt and how the lid is secured afterwards. Mark the opening on the drainage plan so you can find it again.