How Do I Find Stormwater Pipes on My Property?
To find stormwater pipes on your property, start with the house drainage plan and match it to the downpipes and pits you can see. Check your title for any drainage easement. If the pipe route is still unclear, a pipe locator can trace it from an access point. Lodge a free Before You Dig Australia enquiry before any excavation, including work entirely within your boundary.
Published Updated
WA Soakwells
Water where it shouldn’t be?
We install channel drains, driveway grates and stormwater pipe, and connect downpipes, so water stops before the house.
No call-out fee
Check Your Plans
Ask your council’s building services team for the approved site plan and any stormwater drainage drawings kept with the building permit. Give them the property address and the permit number if you have it. Ask specifically for the drainage drawings, since a floor plan may only show the rooms.
The City of Joondalup’s building plan service, for example, charges for copies and accepts requests from owners or representatives with written authorisation. The City of Stirling also takes plan requests from owners and says it has no plans on record for some properties.
Ask your builder for the final drainage drawing, especially if the pipework changed during construction. On a house drainage diagram, follow the stormwater line from each downpipe or grated pit to its discharge point, such as a soakwell. If a feature is missing or out of place, mark that section of pipe as unconfirmed.
Drainage and Stormwater Easements
A drainage easement gives someone else a right to use or access part of your land for drainage. For example, it can give a council access to a drain that crosses your lot.
Order a copy of your Certificate of Title from Landgate and look for an easement entry. Use the referenced survey plan to find the affected strip and its dimensions. The easement document, if there is one, gives the terms of that right.
A strip marked on a survey plan tells you where the easement lies. The buried pipe’s alignment and depth need a separate check on site. If your planned building work is within or beside the easement, ask the easement holder whether you need consent before you finalise the layout.
Tracing Pipes on Site
Start at a visible downpipe or stormwater pit and work towards the discharge point. You can make a first pass from the surface.
- Mark the downpipes, accessible inspection openings and visible pits on a sketch. Add the proposed trench or footing so you can see which pipe sections you need to confirm.
- Look for the inlet and outlet at a pit you can safely inspect from the surface. Note the directions the pipes face, then compare those directions with the plan and the next visible drainage point. A matching direction gives you a likely route, since the pipe can bend underground.
- Ask a utility locator to trace any section that crosses the work area and is still uncertain. For plastic pipe, a locator can feed a small transmitter called a sonde into the drain and follow its signal from the surface. A camera can show what’s blocking access farther along the pipe.
- Get the confirmed route marked on the ground and on your sketch. If an obstruction limits the trace, have the locator mark where their reading stops. Keep the untraced section clear of digging until its location is confirmed.
Before You Dig
Before You Dig Australia is a free referral service. Outline the full work area in your enquiry, including any verge you’ll disturb. The service sends your enquiry to registered asset owners, who provide their plans and instructions. Check the confirmation for any outstanding responses and follow up with those asset owners before work starts.
The plans can show nearby electricity and gas networks. They may also show drainage assets belonging to a registered owner. They give an approximate location. Private stormwater pipes between a house and its soakwell are usually absent, and the service only covers participating asset owners.
Before digging, check that the relevant asset-owner responses are on hand and that your contractor has confirmed where services cross the proposed work. Follow each owner’s instructions for verifying the location and depth of nearby assets. If the private stormwater line is still unconfirmed where you plan to dig, pause that part of the work and have it located.