Retaining Wall Drainage: Draining Behind a Wall

Retaining wall drainage starts with a slotted pipe low in the gravel behind the wall. Water seeps into the gravel, enters the pipe and flows downhill to an outlet. Work out where that water can go before you backfill. A pipe with nowhere to discharge can fill and leave water pressing against the wall.

Published Updated

WA Soakwells

Water where it shouldn’t be?

We install channel drains, driveway grates and stormwater pipe, and connect downpipes, so water stops before the house.

Get a free quote

No call-out fee

WA Soakwells

Water where it shouldn’t be?

We install channel drains, driveway grates and stormwater pipe, and connect downpipes, so water stops before the house.

Get a free quote

No call-out fee

Why Retaining Walls Need Drainage

Water trapped behind a retaining wall adds pressure to the load from the soil. The deeper the trapped water, the more it pushes against the bottom of the wall. After heavy rain, that extra pressure can make the wall bow or lean. Joints can open and the wall can fail.

If an existing wall has started to move, get a structural engineer to assess it before you excavate behind it. If the wall is sound and water has started pooling, check whether the outlet is buried or the pit has filled with sediment.

Drainage Pipe, Gravel and Fabric

The ag pipe, short for agricultural drainage pipe, collects water at the base of the gravel. The gravel gives the water a path down from the soil. Geotextile is a filter fabric that lets water through and holds back the fine soil that could clog the gravel or pipe slots.

  1. Set out the outlet first. Check that the wall drain can fall continuously to it. Mark where you’ll switch from slotted pipe that collects water to solid pipe that carries it away.
  2. Lay the slotted pipe near the base on the retained side, at the level shown on the wall’s drainage detail. If the design calls for a filter sock around the pipe, fit it before covering the pipe.
  3. Place clean drainage gravel around the pipe and up behind the wall to the depth on the drawing. Separate the gravel from the surrounding soil with the specified geotextile. Where surface runoff flows towards the wall, intercept it uphill with the surface drainage shown on the plan.

AS 4678 is the Australian Standard for earth-retaining structures. For a wall that needs engineering, use the wall designer’s pipe levels and drainage detail. Check the council’s permit requirements before work starts, especially if the wall supports a driveway or affects a boundary.

Block and Sleeper Walls

With stacked block walls, the manufacturer’s detail shows where gravel and the pipe sit behind the bottom course. Adbri Masonry’s installation instructions show a socked 100 mm ag pipe and blue metal drainage backfill for the block walls in that guide. Its segmental block drainage diagrams show how the pipe at the base picks up water from the gravel.

On a sleeper wall, the drainage sits behind the sleepers and has to fit around the support posts. The Outback Sleepers guide specifies a plastic membrane behind its concrete sleepers and 20 mm gravel over the base drain. For its timber garden walls, Timberlink’s sleeper guide shows filter fabric between the sleepers and the backfill. Use the liner, pipe position and gravel specified for the wall you’re installing.

Where the Water Goes

Run a solid outlet pipe from the end of the wall drain to a suitable soakwell or an accessible pit that drains to an approved outlet. A soakwell disperses the water into the soil. With a pit, trace where the outlet pipe goes. If the water can’t get out as the pit fills, it can back up into the wall drain.

Choose a soakwell site where the ground can absorb the flow away from the wall and nearby footings. Clay and high groundwater can limit how fast the water soaks away. If you plan to use an existing soakwell that already takes roof water, check it has room for the extra flow. An approved discharge point is needed if the site design routes the water to the street.

Before you cover the pipes, check for continuous fall and run a small amount of clean water through the upstream inspection point. Look for water arriving at the receiving pit or soakwell inlet. If water pools in the line, check for a sag or a blocked outlet while the pipe is still exposed.

WA Soakwells

Soakwells installed right, with a 10-year warranty

Free quotes and no call-out fee. We size the system to your roof and council rule, install it and back it for 10 years.

Get a free quote

No call-out fee

Call today for a free, no-obligation quote