Stormwater Inspection and Maintenance for Sites
A stormwater inspection checks where rain enters the drainage system, how it moves through the site and where it goes. For a strata or commercial property, use the findings to book repairs and set a schedule for the next checks. Start before Perth’s wet season and check sooner where drains block repeatedly or flooding has already occurred.
Published Updated
WA Soakwells
Soakwell not keeping up?
We clean, repair and replace blocked, cracked or collapsed soakwells, and move ones that are in the way of a build.
No call-out fee
What an Inspection Covers
A stormwater inspection follows the drainage route from the surface inlets to the soakwell or the site’s approved discharge point. Give the contractor the drainage drawings if you have them. Mark where water ponded after rain and arrange access to locked car parks or plant rooms.
- Check pits for silt and damaged walls. Check grates and lids for damage or movement underfoot.
- Check accessible soakwells for sediment and signs of collapse or settlement around the lid.
- Check pipe inlets and outlets for obstructions. Ask about a camera inspection if water still backs up after visible blockages are cleared.
- Check detention tanks for sediment that reduces storage. At the tank outlet, check the screen and the opening that controls how quickly water leaves.
Keep staff clear of open pits and tanks. Where entry is needed, arrange for trained contractors to follow WorkSafe WA’s confined space procedures.
How Often Sites Need One
Book a routine stormwater inspection at least annually, preferably before winter. The WA stormwater management manual recommends shorter intervals where sediment or debris builds up quickly. Use the site’s approval conditions and any drainage maintenance schedule when setting your dates.
| Site | Starting schedule |
|---|---|
| Small strata with light traffic and few blockages | Inspect annually before winter. |
| Busy strata, shopping site or commercial yard | Inspect annually and check inlets and pits again at six months. Check sooner where leaves or sediment regularly collect. |
| Site with a detention tank | Follow the approved maintenance schedule. If it gives no interval for screens and outlets, use six months as a starting point for those checks. |
Blacktown City Council’s sample schedule uses six-monthly checks for pits and detention outlet screens. Arrange an extra inspection if a major storm leaves water across an access route or a pit backs up.
The Inspection Report
When you book, agree who will record what was inspected and put the findings in writing. The record needs the inspection date and the location of each item, ideally marked on a plan. Add its condition, photos of faults and any recommended follow-up. List items the contractor could not access so you can book a return visit.
Keep the findings with your strata or site records. For a strata scheme with a 10-year plan, use them to update condition notes and budget for larger renewals. Keep photos, quotes and invoices together so you can show the insurer what happened and which work was routine maintenance. Landgate’s guide to strata titles and Strata Community Insurance’s claims guide describe the records used for each purpose.
From Inspection to Maintenance
Turn each finding into a job with a person responsible and a due date. Isolate a damaged grate where people walk or drive and arrange repair. If the same inlet blocks every winter, move its next check forward. If the pit is clear but water still backs up, book a check of the downstream pipe before quoting replacement work.
After each repair, record what was done and have the contractor confirm that flow is restored and any disturbed covers are secure. Log the completion date and photos against that item. Set the next inspection date while the findings are still fresh.