Get a free quote

Strata Maintenance Plan: Drainage Items to Include

A strata maintenance plan for a Perth complex needs to account for common-property soakwells, driveway grates, stormwater pits and channel drains that are likely to need major work. Record each asset’s location and condition, then estimate when the work will fall due and what it will cost. Keep routine checks and cleaning on a separate schedule so the people doing the work know when to act.

Published Updated

WA Soakwells

Soakwell not keeping up?

We clean, repair and replace blocked, cracked or collapsed soakwells, and move ones that are in the way of a build.

Get a free quote

No call-out fee

WA Soakwells

Soakwell not keeping up?

We clean, repair and replace blocked, cracked or collapsed soakwells, and move ones that are in the way of a build.

Get a free quote

No call-out fee

Strata Maintenance Plans Explained

Under section 100 of the WA Strata Titles Act 1985, a designated strata company must keep a reserve fund and a 10-year plan for non-routine work. The requirement applies to schemes with 10 or more lots. It also applies to smaller strata schemes where the scheme building would cost more than $5 million to replace. For smaller survey-strata schemes, that threshold applies to improvements on common property. Regulation 79 sets out the replacement-cost tests.

The strata company is responsible for the plan. Its council can coordinate the work, ask the strata manager to help within their contract or engage someone to prepare the plan.

A newly established designated strata company must submit its first plan for approval by ordinary resolution at its first annual general meeting. It must revise the plan at least every five years and extend it to cover the next 10 years. The strata company takes the plan into account when preparing each year’s budget. Landgate’s guidance for strata companies explains the plan and budget process.

Regulation 77 requires a condition report for covered items and a funding plan or recommendation. Record how you estimated the costs and what you assumed. For drainage, start with the registered scheme plan, by-laws and site drainage drawings. Check who is responsible for each asset, especially where a drain crosses a lot boundary or serves several lots. Section 91 requires the strata company to maintain common property even when a 10-year plan is optional.

Drainage Items Plans Miss

Inventory the parts below ground as well as the grates you can see. Give the grate and the channel beneath it separate entries when they are likely to need work at different times.

Asset Where to look Service life and replacement cues
Soakwell Follow the shared roof downpipes and driveway drains to the buried chamber. Record the lid separately if it can be replaced on its own. ACO specifies a 50-year design life for its StormBrixx SD polypropylene infiltration tank. For an existing soakwell, use its own specification and have the chamber checked for cracking, collapse or persistent overflow after clearing the connected drains.
Driveway grate Check across driveway entries and at the foot of ramps. Record the grate and its supporting frame. SVC specifies a 50-year design life for its galvanised steel trench grates and frames. Bring the assessment forward if a grate rocks or has broken bars, or if vehicles have damaged its frame.
Stormwater pit Look for covered chambers where pipes meet or where runoff is collected at a low point. The Shire of Broome’s asset management plan uses 70 years for its drainage pits. Estimate the life of your own pit from its material and condition. Check for displaced walls, cracking and movement around the outlet.
Channel drain Look for the long trough below a grate at a garage entrance or across paving. ACO ties the design life of a correctly installed and maintained channel drain to the adjacent pavement, using 30 years as an example for pavement designed to last that long. Inspect joints and the surrounding paving for movement that could bring repairs forward.

Use those figures as examples of how service life is specified. Start with the installed product and the condition report when estimating how many years each asset has left. Record the expected life after the proposed work as well, where appropriate.

Get an itemised estimate for each major job. For a soakwell or pit, ask what the estimate includes for excavation, disposal, pipe reconnection and reinstating paving. For a grate or channel drain, specify whether you are pricing a new grate alone or the frame and channel as well. Record the quote basis, GST treatment and any allowance for future cost increases in the plan.

A Drainage Maintenance Schedule

Set a pre-winter inspection for shared drainage and add a check after heavy rain if water backed up or reached a building. Use the schedule below as a starting point and shorten the intervals where leaves or silt build up quickly.

When Job What to record
Before each winter Walk the shared driveway and paths. Check that grates sit firmly and mark any cracks, low spots or damaged lids. Asset ID and location, inspection date, condition and next check.
Before winter and when debris builds up Clear surface debris. Have the contractor clear channels and pit baskets where fitted, then check that the outlets run freely. Work completed, date, photos and any outlet that still runs slowly.
After heavy rain if water backs up Note where water first pooled or overtopped a drain. If it happens again after cleaning, have the contractor trace the blockage or assess capacity. Water path, affected lots or common areas, photos and follow-up owner.
When an inspection flags major work Get the defect assessed and quote the repair or replacement. Restrict access straight away if a grate or lid is unsafe. Action due, estimated remaining life, work scope, estimated cost and proposed budget year.

Assign each line to a named person or contractor. Keep routine cleaning in the operating schedule and budget. Carry non-routine work due within the next 10 years into the plan and reserve fund forecast.

For example, a caretaker finds silt in a shared garage channel and records slow flow at the outlet after cleaning. The strata manager books a contractor to inspect the outlet pipe. If the contractor finds a cracked pipe under the driveway, the manager records the repair estimate and expected work year in the plan. Close the cleaning job when the next flow check confirms water reaches the outlet. Leave the pipe repair open until it is completed.

Insurance and Water Damage

Drainage maintenance records help an insurer assess how water reached the building and what the strata company did about earlier problems. The cause and policy wording determine what the insurer pays. For example, CHU’s residential strata policy excludes damage caused by poor maintenance and the cost of clearing roots from a blocked drain. It makes an exception for resulting water damage under the root blockage exclusion, subject to the policy’s other terms.

Keep dated inspection photos, cleaning invoices and contractor reports with each asset record. If water enters the building, take safe steps to limit further damage and contact the insurer promptly. Photograph where the water entered and send the insurer the service history and any report on the cause. Ask what authorisation the policy requires before arranging permanent repairs.

WA Soakwells

Soakwells installed right, with a 10-year warranty

Free quotes and no call-out fee. We size the system to your roof and council rule, install it and back it for 10 years.

Get a free quote

No call-out fee

Call today for a free, no-obligation quote